Equipment & Infrastructure
Pilot and Tesla open first joint heavy-truck Megacharger site
· Source: Pilot Company
Pilot and Tesla opened six heavy-duty charging stalls in Ellabell, Georgia, and said 12 additional sites are under construction. A four-stall Flying J location in Tulare, California, opened October 9, with Fort Stockton, Texas, and North Las Vegas locations nearing completion.
Summary and practical context by RoadHouse Recruiting · Reviewed

The first Georgia site is operating
Pilot said the Ellabell travel center has six stalls designed for heavy-duty trucks. Each planned location will have four to eight stalls.
More freight-corridor sites are under construction
Pilot identified 12 additional projects, including near-term openings in California, Texas and Nevada. The rollout is concentrated around major freight corridors.
Charging performance is manufacturer-stated
Tesla says the V4 cabinet can provide up to 1.2 megawatts per stall and add about 60% charge to a Tesla Semi in 30 minutes. Actual charging time depends on vehicle state, conditions and site availability.
Understanding the update
The Ellabell and Tulare locations are completed openings; the remaining locations are announced construction projects and should not yet be treated as available capacity.
What it means for drivers and carriers
Electric-truck fleets should verify charger compatibility, queueing, pricing, uptime and route reserve before depending on a new public charging location.
Questions to consider
- Is the charger compatible with the fleet's truck and connector standard?
- What are the charging price, access rules and expected wait times?
- Is backup charging available if the site is full or offline?
Read the original reporting
This page provides an original summary and practical commentary. The linked source contains the full reporting. Older stories reflect information available on their published dates.
Read the source at Pilot Company ↗ (opens in a new tab)